Norwegian Cruise Line engaged SeaTec Repairs to perform a fleet-wide installation of consumption meters on Main and Auxiliary Engines. The client was looking for a fast track project to quickly implement the new monitoring system and consequently optimize maintenance and fuel consumption. Leveraging from over 200 bunker/fuel meters already installed in partnership with Emerson, SeaTec Repairs was the right partner to perform the job since quality and consistent installation is of utmost importance to assure the perfect functioning of the meters. The contract consisted of:

  • Site survey on 11 vessels
  • Design package up to class approval and as-installed
  • Procurement, planning and installation on board
  • Testing and delivery to class for acceptance
  • Support to Emerson and Eniram for the commissioning phases
  • World-wide installation basis

 
[symple_button url=”https://seatec-services.com/downloads/emerson_consumption_meters_installation.pdf” color=”black” size=”default” border_radius=”3px” target=”self” rel=”” icon_left=”download” ]Download the case study[/symple_button]