April-May 2015: Seatec Repairs was contracted by Callenberg Technology Group to work on the ventilation and air conditioning system of the ALLURE OF THE SEAS.

Numerous penetrations for the A/C system were fabricated and mounted for the new passenger cabins. The works were carried out from Decks 4 to 15, with 50 metres of ventilation duct and 40 metres of A/C duct lines being fabricated of 4mm thickness steel plates.

A new AC unit, with all necessary duct lines, was mounted on Deck 3 (ST side, AC Room – intake and discharge – 40 metres of A/C duct lines).